Custom Node + React replacement for the milestone-1 Retool build. Adds the analytics that aren't possible in stock Retool components — heatmaps, per-panel timelines, panel-type comparisons, shift & technician reports — and lays the groundwork for the mobile app shown in §10. 10 screens, dark by default, designed for a 24/7 control-room.
| Panel | Type | Level | Status | Waiting on | Description | Cmts | Reporter | Technician | Start | Duration | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| GBC-P260W | CMD Panel | L3 | Unscheduled | Parts | PLC cabinet contactor failure — replacement on order from JKT | 4 | KH. Capa Anggara | Kamila Pranowo | 05-09 16:42 | 14d 03h 18m | |
| GBC-P008W | Manned | L1 | Unscheduled | Electrics | No 24V supply, suspected breaker — Electrics team notified | 2 | Hj. Ella Nasyidah | Tgk. Yani Gunawan | 05-17 09:21 | 06d 22h 42m | |
| GBC-P179W | UPS | L2 | Unscheduled | Spill Stand-down | Drift access closed pending mud-rush clear — Gz 3 Devices | 1 | Hasti Mamay | Hj. Ella Nasyidah | 05-20 21:08 | 03d 11h 16m | |
| GBC-P484W | HPT | L5 | Unscheduled | Communications | Radio repeater offline — Comms scheduled tomorrow 06:00 | — | Indah Hasanah | Indah Hasanah | 05-22 04:11 | 02d 04h 02m | |
| GBC-P176W | CMD Panel | L2 | Impaired | Electrics | Cabinet door switch intermittent — operating with override | 3 | Tgk. Yani Gunawan | Tgk. Yani Gunawan | 05-23 19:18 | 19h 24m | |
| GBC-P036W | UPS | L1 | Maintenance | Breaker Team | Q3 breaker swap in progress — Gz 1 Devices | 2 | Hj. Ella Nasyidah | Hj. Ella Nasyidah | 05-24 06:14 | 08h 28m | |
| GBC-P531W | HPT | L6 | Scheduled PM | Scheduled PM | Quarterly PM · belt tension, sensor recalibration | 1 | Hasti Mamay | Hasti Mamay | 05-24 08:00 | 06h 42m | |
| GBC-P057W | Manned | L1 | Unscheduled | Parts | Joystick assembly damaged — RFQ submitted to JKT warehouse | 2 | KH. Capa Anggara | KH. Capa Anggara | 05-23 12:34 | 1d 02h 08m | |
| GBC-P204W | CMD Panel | L3 | Unscheduled | Operations Access | Awaiting blast clearance Gz 2 Borehole | — | Hasti Mamay | Hasti Mamay | 05-23 15:59 | 22h 41m | |
| GBC-P692W | HPT | L7 | Unscheduled | Automation | PLC ladder fault — Automation reviewing logs | 1 | Tgk. Yani Gunawan | Tgk. Yani Gunawan | 05-23 19:30 | 18h 12m | |
| GBC-P323W | UPS | L4 | Unscheduled | Parts | Battery string degraded — replacement ETA Tue | 3 | Hj. Ella Nasyidah | Hj. Ella Nasyidah | 05-24 02:39 | 11h 03m | |
| GBC-P134W | Manned | L2 | Unscheduled | Entry Permit | Permit lapsed — re-issuance with Safety | — | Kamila Pranowo | Kamila Pranowo | 05-24 09:15 | 04h 27m | |
| GBC-P617W | CMD Panel | L6 | Operational | — | Returned to service after PM | — | Humaira Uyainah | Humaira Uyainah | 05-24 11:45 | — | |
| GBC-P561W | UPS | L6 | Unscheduled | Breaker Team | Breaker trip on Gz 4 feeder — locked out | 1 | Humaira Uyainah | Humaira Uyainah | 05-22 18:51 | 01d 19h 51m | |
| GBC-P407W | Manned | L4 | Operational | — | Operational since 19:31 — comms verified | — | Indah Hasanah | Indah Hasanah | 05-24 13:18 | — | |
| GBC-P253W | HPT | L3 | Impaired | MIS | Tag streaming intermittent — MIS investigating | 2 | Kamila Pranowo | Kamila Pranowo | 05-24 10:02 | 03h 40m | |
| Panel | Type | Level | Final state | Waiting on | Description | Reporter | Technician | Opened | Closed | TTR |
|---|---|---|---|---|---|---|---|---|---|---|
| GBC-P407W | Manned | L4 | Operational | — | Closed · Operations resumed after Comms fix | Indah Hasanah | Indah Hasanah | 05-23 12:30 | 05-23 19:31 | 07h 01m |
| GBC-P617W | CMD Panel | L6 | Operational | — | Closed · Quarterly PM complete, signed off | Humaira Uyainah | Humaira Uyainah | 05-23 08:00 | 05-23 14:48 | 06h 48m |
| GBC-P036W | UPS | L1 | Operational | — | Closed · Breaker swap, retested at full load | Hj. Ella Nasyidah | Hj. Ella Nasyidah | 05-22 18:14 | 05-23 03:46 | 09h 32m |
| GBC-P176W | CMD Panel | L2 | Operational | — | Closed · Door switch replaced, override removed | Tgk. Yani Gunawan | Tgk. Yani Gunawan | 05-22 11:22 | 05-22 16:09 | 04h 47m |
| GBC-P253W | HPT | L3 | Operational | — | Closed · MIS retag completed | Kamila Pranowo | Kamila Pranowo | 05-22 04:31 | 05-22 12:18 | 07h 47m |
| GBC-P204W | CMD Panel | L3 | Operational | — | Closed · Permit re-issued, returned to service | Hasti Mamay | Hasti Mamay | 05-21 22:14 | 05-22 06:54 | 08h 40m |
| GBC-P179W | UPS | L2 | Operational | — | Closed · Drift clear, panel restarted | Hj. Ella Nasyidah | Hj. Ella Nasyidah | 05-21 14:00 | 05-21 23:30 | 09h 30m |
| GBC-P692W | HPT | L7 | Impaired | — | Closed → returned as Impaired pending Automation re-tag | Tgk. Yani Gunawan | Tgk. Yani Gunawan | 05-21 06:32 | 05-21 14:18 | 07h 46m |
| GBC-P561W | UPS | L6 | Operational | — | Closed · Breaker reset, feeder verified | Humaira Uyainah | Humaira Uyainah | 05-20 19:11 | 05-21 03:55 | 08h 44m |
| GBC-P057W | Manned | L1 | Operational | — | Closed · Joystick assembly swapped | KH. Capa Anggara | KH. Capa Anggara | 05-20 09:47 | 05-20 18:40 | 08h 53m |
| GBC-P323W | UPS | L4 | Operational | — | Closed · UPS battery string replaced | Hj. Ella Nasyidah | Hj. Ella Nasyidah | 05-19 11:23 | 05-19 20:08 | 08h 45m |
| GBC-P134W | Manned | L2 | Operational | — | Closed · Permit re-issued by Safety | Kamila Pranowo | Kamila Pranowo | 05-19 07:00 | 05-19 11:27 | 04h 27m |
| When | Kind | Value | By | Actor | Note |
|---|---|---|---|---|---|
| 2026-05-24 14:42 | status | Operational | set by | Indah Hasanah | — |
| 2026-05-24 11:08 | status | Impaired | set by | Tgk. Yani Gunawan | MIS tag intermittent |
| 2026-05-23 22:30 | comment | — | by | KH. Capa Anggara | JKT confirmed dispatch |
| 2026-05-23 18:24 | assign | Kamila Pranowo | to | Kamila Pranowo | reassigned from Hasti |
| 2026-05-23 16:11 | comment | — | by | Kamila Pranowo | PLC contactor fault confirmed |
| 2026-05-23 15:42 | status | Unscheduled_Downtime | set by | Kamila Pranowo | waiting on Parts |
| 2026-05-22 09:14 | status | Operational | set by | Humaira Uyainah | — |
| 2026-05-22 03:51 | status | In_Schedule_PM | set by | Hasti Mamay | monthly PM completed |
| 2026-05-19 12:11 | status | Operational | set by | KH. Capa Anggara | — |
| # | Panel | Type | L | DT |
|---|---|---|---|---|
| 01 | GBC-P260W | CMD Panel | L3 | 119.4h |
| 02 | GBC-P008W | Manned | L1 | 92.6h |
| 03 | GBC-P179W | UPS | L2 | 84.1h |
| 04 | GBC-P484W | HPT | L5 | 71.0h |
| 05 | GBC-P561W | UPS | L6 | 66.2h |
| 06 | GBC-P057W | Manned | L1 | 58.8h |
| 07 | GBC-P204W | CMD Panel | L3 | 47.3h |
| 08 | GBC-P692W | HPT | L7 | 41.5h |
| 09 | GBC-P323W | UPS | L4 | 39.0h |
| 10 | GBC-P134W | Manned | L2 | 35.7h |
| Technician | Assigned | Resolved | Median TTR | Longest TTR | Open |
|---|---|---|---|---|---|
|
KP
Kamila Pranowo
|
32 | 29 | 3h 12m | 14d 03h | 11 |
|
TY
Tgk. Yani Gunawan
|
28 | 26 | 2h 51m | 6d 22h | 9 |
|
HE
Hj. Ella Nasyidah
|
24 | 22 | 3h 04m | 4d 11h | 8 |
|
IH
Indah Hasanah
|
22 | 22 | 2h 38m | 2d 04h | 10 |
|
KC
KH. Capa Anggara
|
19 | 17 | 4h 21m | 5d 18h | 7 |
|
HU
Humaira Uyainah
|
18 | 17 | 2h 47m | 1d 19h | 6 |
|
HM
Hasti Mamay
|
17 | 15 | 5h 02m | 3d 11h | 5 |